Dexa Wave

Historical WEC’s that has been tested at sea

During 2011 – 12 DEXAWAVE installed a scale 1:5 prototype at DanWEC Hanstholm.

The system experienced practical problems with the PTO and the mooring system. 

DEXAWAVE started in 2008 testing a small model at AAU in 2009 followed by building a 1:10 scale model installed in Nissum Bredning leading to the installation at DanWEC.

Terminated activities in 2012.

https://wavepartnership.dk/sites/default/files/styles/top_image/public/Historical%20wecs_0.jpg?itok=SHe391Tu